Sorry is this has already been raised.
So I set up to export for 2h 45m with a stop export at 55%.
The activity log stated this would now be for 1h 57m, because of available Solar at 11:42 the SOC was still 76%, but the export stopped with plenty of time and SOC in the bank.
Is the system capable of changing the Schedule mid flow if the SOC isn't as low as expected or can a switch be in place to not use Adjusted times and run until SOC is met.
Thanks in advance...