Hi, I've been monitoring my panel generation this morning. My battery is at 13% and solar is exporting to grid. I'd like to charge battery first or at least know that the system will at some point decide to charge the battery. I tried to set a quick schedule to charge and although it shows current flow to the battery, charge is not increasing. I'm in the process of switching supplier and don't have agile yet. Have I done somthing wrong?
I've setup with WW and tried a schedule to make the most of the sun but after reading it seems I may have missed the one off schedule slot.

How do I force the panels to meet the load, then charge the battery, then export?

EDIT
2 hrs later, the battery is now charging but both from solar and the grid. The load can easily be covered by solar and the residual can go to the battery. Why is the grid now being drawn from?

    Nost Have you still got a charge (from grid) schedule active? What is your WattID please? You can find it on the Advanced section.

    You could temporarily Pause your schedules (slide Pause to On), which will interrupt the charge from grid schedule as well, and then turn the Pause toggle back to off.

    Thanks for looking. My Id is striped-star. I'm waiting for my agile switchover but I don't understand how my system is configured, the settings in shine aren't very intuitive. So I don't know what the baseline behaviour is.. I've mashed some settings re schedules today and they are currently paused. Everything seems to be behaving as it should now, but it was quite confusing earlier.