I seem to have occasional connection issues meaning WW sometimes fails to set a schedule. If the failure occurs at the start of a contiguous set of Agile slots, could WW retry after 30 minutes. Last night I was scheduled to charge from 1.00 to 6.00. The instruction failed at 1.00 so I missed the whole 5 hour period.

trrrible-guidance

    kerregan Good point, we should check whether this is part of a continuous slot like we do in some other cases where criteria/conditions aren't met, and then push the start forward by 30 mins.

    Update to our server functions with this improvement has now been deployed.