WindyMiller As the schedule goes through overnight the charge slots are now being cleared from the Gui. Previously you could look back at what was programmed overnight but now some have been cleared down. They are in the log though. All the export schedules are still there, just some of the charge slots have been cleared down.
Yeah, that's a side-effect of us doing the 30 min re-evaluation for contiguous slots, we effectively shrink the start time of the window by 30 mins after the instruction.
WindyMiller Second one is multiple entries in the log for the exports. This might be related to the problems with exports being grayed out. The 00:30 export is in the log at least 8 times but also in the GE log multiple times which seems to indicate multiple schedules were running.
We'll look into this and fix.
Thanks for the feedback so far everyone!