Agile Octopus integration
- Edited
Reload the whole page, and use 01:00 in the To slot instead of 1.00.
Shouldn’t cause an error like this though. We’ll check the logs.
Thanks for reporting it.
- Edited
Mat can you refresh and use a colon instead of a dot/period?
Right - I think I know what's happening - correct time validation not being applied there. Reload and use 01:00 and you should be good.
Needs a proper validation message like on normal schedules.
Fixed as per release 339. https://community.wonderwatt.com/d/96-wonder-watt-release-notes
- Edited
- Edited
Is it because the charge instruction was sent after the slot had started?
Ooh - interesting. Is that how it works on Giv? If you set/enable a slot shortly after its start time, the whole thing never gets actioned?
What does your Giv log say? Could you have encountered multiple Inverter Timeouts?
I've just opted in to today's Savin Session with Octopus. It will be my first export using the WW scheduler
- Edited
admin Remember you must have a minute between off and on times. End 17:00 and then export at 17:01 or it might not work. This bug was pointed out in another post somewhere.
- Edited
Gazzagreen You're right, this was an issue for Giv.
This might actually be OK for Growatt, but yeah, good point, better to use a min margin either side, will change it now, don't want Growatt failing on my export session!
So do you get more money exporting in the saving hour?
Gazzagreen Yep - as the delta will be calculated between what your regular use is in that time slot versus what it will be now.
And because you can export, this is effectively your 'saving'.
- Edited
Ohhh, I better set the export timer then :)
- Edited
Gazzagreen Was your battery SOC at least 80%?